Skip to main content
  • Villanueva del Campo

    (Valladolid, España)
    01/08/2008

    25 kW Low Voltage photovoltaic solar installation, consisting of 126 215 Wp modules and a 25 kW inverter

  • Villamediana

    29/10/2010

    Installing 100 kW solar photovoltaic Medium Voltage, composed of 528 modules of 215 Wp and 100 kW inverter

  • Olmedo

    (Valladolid, España)
    01/08/2008

    Installing 400 kW solar photovoltaic Medium Voltage, 2,016 comprised of 215 Wp modules and four inverters of 100 kW

  • Geria

    (Valladolid, España)
    11/02/2008

    Installing 100 kW solar photovoltaic Medium Voltage, composed of 504 modules of 215 Wp and 100 kW inverter

    • Fuente Olmedo

      (Valladolid, España)
      01/08/2008

      Installation of 280 kW solar photovoltaic Medium Voltage, 1,428 comprised of 215 Wp modules, two inverters of 100 kW and two 40 kW inverter

    • Fresno el Viejo

      (Valladolid, España)
      22/05/2008

      Installing 100 kW solar photovoltaic Medium Voltage, composed of 504 modules of 210 Wp and 100 kW inverter

    • Ciguñuela

      (Valladolid, España)
      01/07/2008

      Installation of 300 kW solar photovoltaic Medium Voltage, 1,512 comprised of 215 Wp modules and three inverters of 100 kW

    • Cevico de la Torre

      (Palencia, España)
      01/08/2008

      Installation of 200 kW solar photovoltaic Medium Voltage, 1,008 comprised of 215 Wp modules and two 100 kW inverters

      • Ceinos de Campos

        (Valladolid, España)
        20/08/2007

        Installing 100 kW solar photovoltaic Low Voltage, composed of 504 modules of 210 Wp and 100 kW inverter

      • Becilla de Valderaduey

        (Valladolid, España)
        03/06/2013

        With a total power of 4,700 kW installations.

      • Acisa de las Arrimadas

        (León, España)
        03/06/2013

        With a total power of 4,700 kW installations.