Villanueva del Campo
(Valladolid, España)
01/08/200825 kW Low Voltage photovoltaic solar installation, consisting of 126 215 Wp modules and a 25 kW inverter
-
Villamediana
29/10/2010
Installing 100 kW solar photovoltaic Medium Voltage, composed of 528 modules of 215 Wp and 100 kW inverter
-
Olmedo
(Valladolid, España)
01/08/2008Installing 400 kW solar photovoltaic Medium Voltage, 2,016 comprised of 215 Wp modules and four inverters of 100 kW
-
Geria
(Valladolid, España)
11/02/2008Installing 100 kW solar photovoltaic Medium Voltage, composed of 504 modules of 215 Wp and 100 kW inverter
-
Fuente Olmedo
(Valladolid, España)
01/08/2008Installation of 280 kW solar photovoltaic Medium Voltage, 1,428 comprised of 215 Wp modules, two inverters of 100 kW and two 40 kW inverter
-
Fresno el Viejo
(Valladolid, España)
22/05/2008Installing 100 kW solar photovoltaic Medium Voltage, composed of 504 modules of 210 Wp and 100 kW inverter
-
Ciguñuela
(Valladolid, España)
01/07/2008Installation of 300 kW solar photovoltaic Medium Voltage, 1,512 comprised of 215 Wp modules and three inverters of 100 kW
-
Cevico de la Torre
(Palencia, España)
01/08/2008Installation of 200 kW solar photovoltaic Medium Voltage, 1,008 comprised of 215 Wp modules and two 100 kW inverters
-
Ceinos de Campos
(Valladolid, España)
20/08/2007Installing 100 kW solar photovoltaic Low Voltage, composed of 504 modules of 210 Wp and 100 kW inverter
-
Becilla de Valderaduey
(Valladolid, España)
03/06/2013With a total power of 4,700 kW installations.
-
Acisa de las Arrimadas
(León, España)
03/06/2013With a total power of 4,700 kW installations.